Transportation of all kinds of materials taken from the excavation, quarry or warehouse to the storage and filling area at any distance: 8176323,75 tons, Excavation of the lined and uncoated canal: 4672185.00 m3, Filling with the material obtained from the excavations: 201758,00 m3, Stabilized filling : 26210,00 m3, Sand, Gravel or Stone Filling: 63553,00 m3, Stone Fortification with the material brought from the quarry: 234000,00 m3, C25 concrete/reinforced concrete poured in situ for culvert bridges of all widths and spans: 2386,00 m3, Making in situ C20 concrete/reinforced concrete for culvert bridges of all widths and spans: 1813.00 m3, Making every dose of grebeton to be used in every construction and manufacturing: 150.00 m3, Making all kinds of pre-stressed reinforced concrete: 365.40 m3 , S420a Preparation and bending of reinforced concrete irons: 635 tons, Various iron works: 24,000,00 kg, Elostomer Support: 607,500,00 cm3, Cast-in-place piles of all diameters and sizes: 1,472.00m